capable of receiving rainfall peaks of 500 m3/h, 27,300 L.E. construction of a wastewater treatment plant with capacity, providing full-scale cleaning, with sludge dewatering. Full implementation of technological, electrical and control engineering installation works, running a trial operation for 6 months.
As part of the facility, a new mechanical pre-cleaner, a two-line Contiseq® biological cleaning line, a sludge dewatering system including a screw press and an odor extraction and odor treatment unit were also established.