Loading...
2011

Nestlé Hungária Kft., Bük

Authorization, design, implementation and trial operation of complete wastewater pre-treatment plant (flotation technology) as main contractor with a capacity of 625 m3/d. The plant treats effluent from a pet-food processing facility (wet and dry production technologies) of the famous Swiss food industrial giant.

Update cookies preferences