2019. Between December and June 2021, the expansion works of the waste water treatment plant in Komárom took place, during which Inwatech Kft was commissioned with the following tasks:
As a result of the investment, the hydraulic capacity increased from 4,500 m3/day to 8,000 m3/day, and the biological capacity increased to the equivalent of 57,067 inhabitants. During the trial operation period, it was proven that the quality of the treated wastewater meets the requirements for all parameters.